Thinking of renovating your apartment in Dubai? Here’s what to expect when it comes to timelines, permits, kitchen delivery delays, and realistic durations for small and full-scale renovations.
Worried About How Long a Renovation Takes? You’re Not Alone
It’s one of the first questions homeowners ask us:
“How long is this going to take, really?”

If you’re planning to renovate your apartment or villa in Dubai, you probably want to understand what you’re committing to — in time, not just money. Whether you’re staying in the home, moving out, or preparing to rent or sell — a proper timeline is key.
So let’s walk through the realistic renovation timeframes in 2025, including what takes the longest, what can cause delays, and how we help our clients plan with clarity and confidence.
Updated Timelines: What to Expect in 2025
| Renovation Type | Average Time |
|---|---|
| Light updates (paint, tiling) | 2–3 weeks |
| Kitchen or bathroom remodel | 5–6 weeks (incl. preparation time) |
| Full apartment renovation | 8–12 weeks (2–3 months) |
| Full villa renovation | 4–6 months depending on size |
💡 Note: Permit approvals from building management or Dubai authorities can take up to 2 weeks before work even begins.
Why Renovations Take Time (and Why That’s a Good Thing)

🧱 Larger Scope = More Time
A small bathroom takes a few weeks. A 3-bedroom full gut renovation takes months — and that’s without changes along the way.
🗂️ Permits in Dubai
Even minor renovations need NOC approvals from the building or developer. For major works, DLD permits or municipality approvals may be required. These can take 7–14 working days, depending on the scope and location.
🛠️ Material Preparation — Especially for Kitchens
Here’s a common misconception: “Once I sign off, the kitchen installation starts.”
In reality:
- Kitchen preparation and manufacturing takes 3–4 weeks
- On-site installation adds another 5–7 days
So even a “quick” kitchen job realistically takes over a month from approval to completion.
🚧 Living in the Property? Depends on the Job
Some minor renovations allow you to stay in your home with little disruption. But in cases involving:

- Full flooring replacement
- Wall demolition or layout changes
- Heavy electrical or plumbing works
➡️ It may be unsafe or very difficult to live there during the job. We’ll always tell you up front and help plan around it.
What Can Be Done in 2–3 Weeks?

- Painting walls and ceilings
- New light fixtures and switches
- Tiling in select areas
- Simple storage upgrades
- Feature walls or gypsum ceilings
What Takes 5–6 Weeks?
- Kitchen remodels (including preparation)
- Bathroom remodels with new tiling, plumbing, and layout
- Flooring for a full apartment
- Minor carpentry and electrical upgrades
What Takes 2–3 Months (Apartment Renovation)?
- Full unit renovation: kitchen, 2–3 bathrooms, flooring, painting, ceilings
- Layout adjustments (wall removal, open plan kitchen)
- Smart home systems or integrated lighting
- Custom wardrobes and storage units
What Takes 4–6 Months (Villa Renovation)?
- Full internal and external villa upgrade
- Landscaping, outdoor kitchens, pergolas
- Multiple kitchens and bathrooms
- Extension or additional rooms
- Full fit-out with bespoke finishes
Real Example: Unity Dubai Client Timeline
Client: 2-Bed Apartment, Dubai Marina
Scope: Full renovation – kitchen, 2 bathrooms, floors, lighting
Timeline:
- Week 1–2: Permits + approvals
- Week 3–6: Kitchen preparation off-site
- Week 7–8: Bathroom tiling and electrical work
- Week 9–10: Kitchen install, final finishes
Total time: ~10 weeks (without major delays)
FAQs: Renovation Timelines in Dubai

Q1: Can I live at home during the renovation?
It depends. For small updates like painting, yes. But for major works (bathrooms, kitchens, floors), it’s often safer and faster if the space is vacant.
Q2: How long does a kitchen renovation take?
- 3–4 weeks for manufacturing and preparation
- 1 week for installation
So plan for 5–6 weeks total.
Q3: What causes delays in renovation projects?
- Waiting on permit approvals (up to 2 weeks)
- Slow material selections or last-minute changes
- External delivery delays from suppliers
- Unplanned design modifications mid-project
Q4: Can you guarantee the timeline?
We create a detailed timeline and keep you updated — but real-life issues (like permits or supplier delays) can shift things. We promise honesty and transparency every step.
Final Thoughts: Time is a Tool, Not a Problem
Yes, renovation takes time — but it’s also your opportunity to make sure everything is done properly, beautifully, and legally.
At Unity Dubai, we don’t rush jobs or cut corners.
We:
- Handle all permits and logistics
- Keep your timeline updated
- Guide you step-by-step so you know what’s happening
- Deliver high-quality work, every time
Want to know how long your specific project will take?
Let’s talk. Send us your apartment size and goals — and we’ll give you an honest time estimate.